Domestic New Builds

Part L Compliance and Provisional BER Analysis

From plans, draw up requirements to meet compliance with TGD Part L 2011/2017 of the building regulations, prior to construction, in accordance with the clients needs

  • Full list of required insulation
  • Full specification on Heating System and Heating Controls
  • Heat load calculation
  • Specification of air tightness and ventilation
  • Guidance on air tightness detailing, installation and testing. to achieve low air tightness results
  • Specification of renewables required to meet Part L
  • Issue BERs
  • Smart Compliance with Part L rather than ‘brute force’ method of over insulating buildings or over-sizing solar systems