From plans, draw up requirements to meet compliance with TGD Part L 2011/2017 of the building regulations, prior to construction, in accordance with the clients needs
- Full list of required insulation
- Full specification on Heating System and Heating Controls
- Heat load calculation
- Specification of air tightness and ventilation
- Guidance on air tightness detailing, installation and testing. to achieve low air tightness results
- Specification of renewables required to meet Part L
- Issue BERs
- Smart Compliance with Part L rather than ‘brute force’ method of over insulating buildings or over-sizing solar systems